Translations · Text 8530 · 10000101010010 · 4 min read

Thal AB zwischen der Cathariner Windkunst und den Herzberger Teichen

Levelling the valley between the Catharina wind engine and the Herzberg ponds

Reference
Gerland 1906, pp. 190-192, No. 104
Date
c. 1680
Original
German
Earlier English
None found
Cite
Gottfried Wilhelm Leibniz, “Thal AB zwischen der Cathariner Windkunst und den Herzberger Teichen” (c. 1680), Gerland 1906, pp. 190-192, No. 104. English translation, Monadica, text 8530. https://monadica.org/t/8530-thal-ab-zwischen-der-cathariner-windkunst-und

Suggest a correction

View

Editor’s note

Survey notes on a quarto sheet: the levelling of the valley between Leibniz's wind engine at the Catharina mine and the Herzberg ponds near Clausthal, to see how high a dam would have to be to hold water there, with the station-by-station readings, the lengths of the dam line and of a ditch round the hill, and a description of the levelling method with a 30-foot cord and a hanging water level, and of a check by sighting. Gerland takes it as proof of how seriously Leibniz pursued his original plan of pumping the spent water back up by wind. With Figs. 141–144.

German, with Latin words
English
1
[S. 190] Thal AB zwischen der Cathariner Windkunst und den Herzberger Teichen ist abgemessen worden. — Von CE herab nach den Teichen zu längs perpendiculariter 21 schuh 4 Zoll, EG desgleichen nach der Wind- [S. 191] kunst zu. aber röhre DE oder FE giebt perpendicular Höhe 5 schuh 7 Zoll weniger, so man wieder hinab gewogen, also bleibt 15 schuh 17 Zoll, oder 2 1/2 lachter weniger 8 Zoll. Wollte man nun in A einen Damm stossen 15 schuh 7 Zoll hoch, würde das wasser im thal komen bis H; will man es stauen lassen bis in den Winkel B, müste man noch 3 Zoll den Damm aufführen. Man hat bei der abwegung sich einer schnur bedienet von 30 schuh lang, daran die wasserwage gehanget, also von einem stand zum andern den Unterschied der höhe gemessen. [Fig. 141]
[p. 190] The valley AB between the Catharina wind engine and the Herzberg ponds has been measured. From CE down towards the ponds, lengthwise, perpendicularly 21 feet 4 inches, EG likewise towards the wind [p. 191] engine. But the pipe DE or FE gives a perpendicular height 5 feet 7 inches less, which was levelled down again; so there remain 15 feet 17 [sic] inches, or 2 1/2 Lachter less 8 inches. If one now wanted to put a dam 15 feet 7 inches high into A, the water in the valley would come up to H; if one wants to let it be held back up to the corner B, one would have to raise the dam 3 inches more. In the levelling a cord 30 feet long was used, with the water level hung on it, and so the difference of height was measured from one stand to the next. [Fig. 141: drawing of the valley seen in perspective, a wedge-shaped basin from A to B with the points C, E, F, G and the ditch running down to H; letters A, B, C, E, F, G, H, as far as legible.]
2
Von [Gerland: Hier an die Seite geschrieben: bei C, D, E, F, G sind pfähle eingeschlagen, längs des grabens allemahl vor 2 stationes vier pfahl eingeschlagen.] C nacher stationen: 1. 3 schuh 3 Zoll, LM, summa 3,3. — 2. 2,10, nO, summa 6,1. — 3. 1,3, pZ, summa 7,4. — 4. 3, RS, summa 10,4. — 5. 2,4, TV, summa 12,8. — 6. 2,4, Wx, summa 15. — 7. 2,10, yζ, summa 17,10. — 8. 3,6, βγ, summa 21,4.
From [Gerland: written here at the side: at C, D, E, F, G stakes have been driven in; along the ditch, four stakes driven in every 2 stations] C to the stations: 1, 3 feet 3 inches, LM, sum 3,3. 2, 2,10, nO, sum 6,1. 3, 1,3, pZ, sum 7,4. 4, 3, RS, sum 10,4. 5, 2,4, TV, sum 12,8. 6, 2,4, Wx, sum 15. 7, 2,10, yζ, sum 17,10. 8, 3,6, βγ, sum 21,4.
3
tem von C nacher D wieder herab 3,1. 2,8 minus 3,1. 5,9.
Item [tem, sic], from C to D down again 3,1; 2,8 minus 3,1; 5,9.
4
von E nacher G. 4. 3,9. 3,4. 1,6. 3. 2,4. 3,5. — −3,1. 2,8. Suma 4. 7,9. 11,1. 12,7. 15,7. 17,11. 21,4. — −3,1. 5,9.
From E to G: 4; 3,9; 3,4; 1,6; 3; 2,4; 3,5; then −3,1; 2,8. Sum: 4; 7,9; 11,1; 12,7; 15,7; 17,11; 21,4; then −3,1; 5,9.
5
item von G nacher E wieder herab 3,1. 2,8.
Item, from G to E down again 3,1; 2,8.
6
Acht stationes waren von e nacher i, davon 2 wieder zurück, bleiben 6, 7 stationes von E nacher G, davon zwei zurück, bleiben 5, Nun 6 und 5 thut 11 stationes, iede von 30 schuhen; gesezt, es waren 32 schuh oder 2 ruthen, so wären 28 ruthen weniger 11 mahl 2 ruthen oder weniger 22 schuh, das ist weniger 2 ruthen und 6 schuh, thut 25 ruthen 6 schuh. Die länge des Dammes, oder dessen inhalt muss aus der abhängung und distanz der stationen intentiert werden. Graben GH umb den berg herumgeführt, so das wasser, das der wind bey H herauffbringen soll, empfanget und nach G führet, hat 28 stationes, iede von 30 schuhen, sind 56 ruthen weniger 36 schuh, d. ist weniger 3 ruthen und 8 schuh, thut 52 ruthen und 4 schuh. [Fig. 142]
There were eight stations from e to i, of which 2 [went] back again, leaving 6; 7 stations from E to G, of which two back, leaving 5. Now 6 and 5 make 11 stations, each of 30 feet. Supposing they were 32 feet, or 2 rods [ruthen], it would be 28 rods less 11 times 2 rods [sic], or less 22 feet, that is less 2 rods and 6 feet, which makes 25 rods 6 feet. The length of the dam, or its content, must be worked out [intentiert] from the slope and the distance of the stations. The ditch GH, carried round the hill, which receives the water that the wind is to bring up at H and leads it to G, has 28 stations, each of 30 feet, which are 56 rods less 36 feet, that is less 3 rods and 8 feet, making 52 rods and 4 feet. [Fig. 142: drawing of a sloping line of levelling from the upper left down to the right, with vertical staffs at the stations and the horizontal cord steps between them, marked with Greek and Latin letters; letters ζ, δ, ε, ϑ, λ, μ, ξ, σ, M, n, o, h, R, T, W, y, β, γ, as far as legible.]
7
Abwegung: 2 stangen AB, CD. abhängiges Land BD, schnur AC, welche horizontal vermittelst der angehängten Wasserwage FH. gesezet, und AB sey 1 schuh und CD 3 schuh, so ziehet man von CD ab CE, gleich so viel als AB, nehmlich 1 schuh, bleibt DE, welches ist der fall, oder umb 2 schuh, wie D tieffer, als B. [Fig. 143]
Levelling: 2 staffs AB, CD; sloping ground BD; cord AC, which is set horizontal by means of the water level FH hung on it; and let AB be 1 foot and CD 3 feet; then one subtracts from CD the part CE, equal to AB, namely 1 foot; there remains DE, which is the fall, or by 2 feet, as D is lower than B. [Fig. 143: drawing of two staffs A, B and C, D on sloping ground, joined by a horizontal cord with the half-circle level F, L, H hanging from it and its plumb line; letters A, B, C, D, E, F, H, L, M, N, as far as legible.]
8
Die Wasserwage FH hanget an der schnur mit eingebogenen Krampen, so dass man sie [S. 192] leicht hinein und heraushangen; ist ein halber Zirkel FMH mit graden, daran gehet in der Mitte herab LM, an L hanget das Loth oder die Bleywage LN, welche wenn sie recht auff M trifft, so ist die schnur horizontal.
The water level FH hangs on the cord with bent-in hooks, so that one can [p. 192] easily hang it on and take it off. It is a half-circle FMH with degrees, from the middle of which LM runs down; from L hangs the plumb or lead level LN, and when this falls exactly on M, the cord is horizontal.
9
Wenn man durch viele stationes gemessen, kan man zur probe von einem ende zum andern sehen und 2 stangen nicht weit von einander stecken; in gerader Linie auff S, weil Q und S die beyden enden; erst mit der schnur abwegen die enden, finde q und r mit einander horizontal, alsdann etwas hineingesteckt und alsdann fortgesehen von q über r nach S. S und q gleicher Höhe, so weiss man, dass p und t horizontal, wenn es zutrifft; so soll man auch von S wieder zurück sehen. [Fig. 144]
When one has measured through many stations, one can, as a check, sight from one end to the other and set up 2 staffs not far apart, in a straight line towards S, since Q and S are the two ends: first level the ends with the cord, find q and r horizontal with each other, then put something in, and then sight on from q over r to S. If S and q are at the same height, one knows that p and t are horizontal, if it agrees; and one should also sight back again from S. [Fig. 144: drawing of three staffs Q, R, S standing on a curved line from p to t, with marks q and r near their tops; letters p, Q, q, R, r, S, t.]
10
[Gerland, Anmerkung:] Der noch vorhandene Hausherzberger Teich liegt oberhalb der früheren Grube Catharina. Die mitgeteilten Messungen beweisen, wie ernsthaft es Leibniz mit seinem ursprünglichen Entwurfe nahm, und daß nur die überaus ungünstigen Verhältnisse seine Ausführung verhindern konnten.
[Gerland, Note:] The Hausherzberg pond, which still exists, lies above the former Catharina mine. The measurements reported show how seriously Leibniz took his original design, and that only the extremely unfavourable circumstances could prevent its execution.

Text. Gerland 1906, pp. 190–192, No. 104, under "Wasserhebung mittelst der Kraft des Windes". Gerland's heading: one quarto sheet. Source: the Internet Archive OCR of the Google scan (leibnizensnachg00gerlgoog), corrected by us against the page images. Not in the Akademie-Ausgabe volumes VIII,1–4, and not in the Potsdam concordance (2023). Undated; it belongs to the Clausthal wind-engine trials of 1680–1686 (Ours). No heading; the title is the opening words.

  • Gerland's side note on the stakes is kept where his footnote mark stands, after "Von".
  • The station readings are printed by Gerland as a small table; we give them as running text, station by station, with "3,3" meaning 3 feet 3 inches.

Corrections and [sic]. "15 schuh 17 Zoll" for 15 feet 7 inches, as the next sentence has it (Ours); even so, 21 feet 4 inches less 5 feet 7 inches is 15 feet 9 inches. "tem" for item. "11 mahl 2 ruthen" should be 11 times 2 feet (Ours). The other figures are printed as they stand; the reckoning of the rods is not fully consistent.

Existing English. None known.

(Ours). Units: Schuh (foot) of 12 Zoll (inches); Lachter, the mining fathom, here taken as about 6 1/2 feet; Rute (rod) of 16 feet, as Leibniz says. The plan behind the survey is the one described in Gerland's note to No. 101 (our 8527): to collect the water that had run off the engine wheels and pump it back up by windmills into a pond above.

Licence. Gerland 1906 is in the public domain. This translation is CC BY-NC 4.0.

This text in the whole · 1680, a year from which 321 pieces are catalogued166316901716